How much charging power fits the connection?
Place arrival, departure, energy demand and simultaneity alongside the existing load.

PeakPilot for installers
Test PV, charging infrastructure and battery storage against the site's actual profile. Compare configurations and show what is feasible within the connection.
PeakPilot calculates grid import, export and asset behaviour on the same interval timeline.
Beyond the product specification
The outcome depends on the usage profile, grid connection and interaction between every asset on site.
Power and annual yield do not show in which intervals a limit or peak occurs.
PV, charging points and battery dispatch change the same grid import and export.
Without a scenario comparison, it remains unclear why a configuration fits this site.
Before the quote
Bring technical feasibility and financial assumptions together before components are committed.
Place arrival, departure, energy demand and simultaneity alongside the existing load.
Compare power, capacity, losses and operating strategy for the project.
Review the effect on grid import, export, peak load and energy costs.
From site to proposal
Use the site as the baseline and make component choices visible as separate scenarios.
Import interval data or define an explicit profile for planned load or generation.
Set up PV, EV charging and battery storage using the technical parameters in the proposal.
Assess import and export separately and see when a scenario reaches the configured limit.
Use the same data, contract assumptions and financial baseline for each configuration.
Method
Import load and generation and configure the grid connection and energy contract.
Add the proposed PV, charging or battery assets with project-specific parameters.
Use grid impact, energy flows and financial outcomes to support the quote.
With the quote
A simulation shows which scenario was offered and which project data supports it.
Visibility into decisive intervals and potential exceedances.
An overview of the effect of different asset options.
Project inputs, assumptions and outcomes as an appendix to the proposal.
Applications
See how PeakPilot structures specific investment questions.
FAQ
For an exploratory scenario, you can use an explicit profile. Record its source and uncertainty and update the scenario when measured interval data becomes available.
Yes. Create one scenario per model and use the technical values from its product specification, so differences in power, capacity and efficiency remain visible.
Yes. These assets can be modelled with load and the grid connection on the same interval timeline.
The battery model supports charging and discharging efficiency, standby loss and annual degradation. Use project-specific values from the technical documentation.
Yes. Configure the contract and tariffs for the project and always verify that the data is current and applicable.
No. It is a model estimate based on entered data, performance, costs and tariffs. Contract and investment terms must be verified separately.
Start with site data and compare PV, charging and battery storage using the same baseline.
Start a free simulation